Further description of the schedule and mechanism being used for drawdowns from this vault can be seen in this post from the Collateral Engineering Services Core Unit (CES-001).
→ https://forum.makerdao.com/t/r...
3/
可以在抵押工程服务核心单元 (CES-001) 的这篇文章中看到有关用于从该保险库提取资金的时间表和机制的进一步描述。
→ https://forum. makerdao.com/t/r...
3/