@TwoMinded_ @zorinaq Cost benefit analysis says yes. The cost is really low, although strictly speaking not zero. The benefits are uncertain but there is ample, even if not conclusive, evidence (including in this thread) it is likely positive.
@Twodomind_u@zorinaq成本效益分析公司说是的。成本非常低,虽然严格来说不是零。其好处尚不确定,但有充分的证据(包括本文)表明它可能是积极的,即使不是决定性的。